They’ve been working on improving the backstage area behind Main Street USA as an overflow bypass exit for busy periods (holidays, during parades, etc.) for quite some time now. Saturday, November 29th I used the still-under-construction bypass and took this hurried shots. Please excuse the poor quality, they were taken quickly while walking.
Oddly, there was a lot of work done or being done on the ground level. Grassy/flower bed areas, railings that sort of thing. Some of the buildings have gotten paint work as you can see, but others are still just dumpsters and pipes without any attempted masking whatsoever. It made for a very hodgepodge look.